GOLIAT

Commissioning support for one of the North Sea’s most advanced FPSOs, ensuring reliable start-up, validated control and safety systems, and high-performance operations in demanding offshore conditions.
Time to Market
3 years
KS Man’s Hours of Work
21,000
Advanced Technologies
100%

Overview

In the icy waters of the Barents Sea, near Hammerfest, ENI Norge launched one of the most ambitious offshore projects ever built, the Goliat FPSO, the first floating production unit to operate in this extreme environment.
Designed to withstand the Arctic’s unpredictable conditions, Goliat quickly became a symbol of innovation and engineering courage. Built in Korea by Hyundai Heavy Industries (HHI), it is one of the largest circular floating platforms ever constructed for the North Sea.
When ENI and Statoil needed a partner to guarantee safety, reliability, and precision across the platform’s complex automation systems, they chose Key Solution.

Role KS

KS joined the project during the final commissioning phase, bringing deep expertise in process control and safety systems.
Our mission was to ensure that every subsystem, from gas compression to emergency shutdowns, worked seamlessly together, even under the harshest weather conditions.

The team managed integration, testing, and troubleshooting of the Process Control System (PCS) and Safety Instrumented Systems (SIS), ensuring compliance with IEC 61511, NORSOK, and SIL standards.
We worked side by side with operators during startup, providing 24/7 support and continuous optimization.

Deliverables

  • Commissioning and fine-tuning of control and safety systems (PCS, ESD, PSD, F&G).
  • Full verification of safety hierarchy and SIL compliance.
  • Functional and loop testing (FAT, SAT, C&E, SIF).
  • Control logic optimization and HMI enhancement for better usability.
  • Integration of gas compression and reinjection systems.
  • On-site operator support during startup and performance validation.

Results

The collaboration between ENI Norge and KS enabled a smooth and successful start-up, reaching the “First Oil” milestone as a key achievement for offshore automation in Arctic conditions. Through full compliance with safety and control standards and the verification of SIL 2 and SIL 3 performance, the project ensured a high level of operational reliability. The result was a more intuitive and dependable HMI, reduced troubleshooting time, improved maintenance workflows, and stable, safe production from day one.

Other Case Studies

California, USA

In sunny California, Solarion collaborated with a real estate giant to integrate cutting-edge solar technology. This project brought sustainable power to residential communities, reducing emissions and costs while enhancing energy efficiency.

Learn More
California, USA

In sunny California, Solarion collaborated with a real estate giant to integrate cutting-edge solar technology. This project brought sustainable power to residential communities, reducing emissions and costs while enhancing energy efficiency.

Learn More

Let's Work Together

Become part of a dynamic, international company that connects innovation, automation, and data management. With global mobility and career growth opportunities, we help you engineer your future.